St Pauls College
Client
Onslow Concrete
Project date
January – September 2025
Timeframe
Estimated 6 – 10 months
Location
Drouin
Budget
$15M
Client brief
An entire new school and campus for St Pauls College will provide the local township with a fantastic new catholic school.
Project outcome
This job doesn’t have the complexity of others, but there is still a large volume of steel to go into these slabs. These slabs are mainly school buildings for this new facility which will combine Waffle Pods with slab mesh and bar.