Traralgon Multi Level Car Park
Client
Onslow Concrete
Project date
April 2025 – April 2026
Timeframe
Estimated 12 months
Location
Traralgon, Victoria
Budget
$25M
Client brief
The major infrastructure project is a five story multi level carpark build with complex PT slabs with major tonnage of steel.
With an estimated 400+ tonne of steel within this job, this will be a great project to be part of.
Project outcome
With eight in-house schedulers and an experienced production team, accompanied with great lead times, this is what separates us from our competitors.
The detail within the slabs of this job means our schedulers will have their work cut out, but the experience of our team will ensure the product supplied will be on-point and cause no hold ups or issues on site. We have a great system in our production which means that if the client is urgently after more material we can supply this in a timely manner.